Shantou · China +86 133 6387 9944 ISO 9001 · EU 10/2011 · RoHS joe@8pck.com
Home / Custom
Custom development

Copy an Existing Bottle, or Start From a Drawing

Two paths: we match your sample against 3,000+ existing moulds (no tooling cost), or we cut a new mould (USD 800+, 15–20 days).

Process

Five Stages, Fixed Durations

If a stage slips, you hear it the same week, not at the ship date.
01
BriefSend a drawing, a sample photo or a reference bottle. Tell us the volume and the market.
02
DFMWe check wall thickness, neck, demoulding and packing — and say what will not work.
03
QuotationTooling (if any), unit price, MOQ, lead time. One page, no ranges.
04
T1 sampleFirst samples in 25 days. You test fill, cap torque and drop.
05
Production30 days from approved sample. Photos before loading.
Tooling

What a New Mould Actually Costs

ItemDetailCostTime
Blow mould (new shape)Single cavity, steelfrom USD 80015–20 days
Injection mould (cap)Multi-cavityfrom USD 3,50025–30 days
Mould modificationNeck, weight or engravingfrom USD 3007–10 days
Existing mould3,000+ on the shelfNo charge—

Mould ownership and exclusivity are agreed in writing before the first payment.

Not Sure Whether a Mould Exists?

Send a photo of the bottle you want copied. We check the shelf the same day.

Send a Photo →
WhatsApp Get a Quote →